WEKO3
アイテム
Modeling for the Optimal Co-scheduling Problem of Data Replication and Job Execution in Data Grids
https://osu.repo.nii.ac.jp/records/1366
https://osu.repo.nii.ac.jp/records/1366464a62cc-4bb5-409a-b518-9741c7c0969c
名前 / ファイル | ライセンス | アクション |
---|---|---|
KJ00005072230.pdf (321.0 kB)
|
|
Item type | 紀要論文(ELS) / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2008-02-01 | |||||
タイトル | ||||||
タイトル | Modeling for the Optimal Co-scheduling Problem of Data Replication and Job Execution in Data Grids | |||||
言語 | en | |||||
言語 | ||||||
言語 | eng | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | departmental bulletin paper | |||||
ページ属性 | ||||||
内容記述タイプ | Other | |||||
内容記述 | P(論文) | |||||
記事種別(日) | ||||||
値 | 論文 | |||||
記事種別(英) | ||||||
言語 | en | |||||
値 | Article | |||||
論文名よみ | ||||||
その他のタイトル | Modeling for the Optimal Co-scheduling Problem of Data Replication and Job Execution in Data Grids | |||||
著者名よみ |
ナカニワ, アキコ
× ナカニワ, アキコ× / |
|||||
著者名(英) |
Nakaniwa, Akiko
× Nakaniwa, Akiko× Venugopal, Srikumar× Buyya, Rajkumar |
|||||
著者所属(日) | ||||||
値 | 大阪産業大学工学部情報システム工学科 | |||||
著者所属(日) | ||||||
値 | / | |||||
著者所属(英) | ||||||
言語 | en | |||||
値 | Department of Information Systems Engineering, Osaka Sangyo University | |||||
著者所属(英) | ||||||
言語 | en | |||||
値 | The University of Melbourne, Computer Science and Software Engineering Department | |||||
著者所属(英) | ||||||
言語 | en | |||||
値 | The University of Melbourne, Computer Science and Software Engineering Department | |||||
抄録(英) | ||||||
内容記述タイプ | Other | |||||
内容記述 | There are many challenges in Data Grids, and especially the data replication and the job scheduling are significant problems. There have been many works on the data replication and the job scheduling in Data Grids separately. However, there are still only a few works on solving those two significant problems together in Data Grids. In this work, we propose the optimization model for the co-scheduling problem of the data replication and the job execution in Data Grids, which is more realistic and widely adaptable to real systems. We use 0-1 integer programming model to formulate the co-scheduling problem of the data replication and the job scheduling. Our final goal in this work is to find the optimal solution, that is, the data replication and job assignment, such that it minimizes the response time. The proposed optimization model will lead us this goal. | |||||
雑誌書誌ID | ||||||
収録物識別子タイプ | NCID | |||||
収録物識別子 | AN0002870X | |||||
書誌情報 |
大阪産業大学論集. 自然科学編 巻 119, p. 41-46, 発行日 2008-02 |